Data centers are not new—what’s changed is their scale, complexity and concentration of value.
5-minute read
Treating data center projects as familiar, relatively low-hazard properties misses the nature of the exposure. As artificial intelligence (AI) drives demand for greater computing power and cooling, some hyperscale campuses today represent tens of billions of dollars in investment. From that lens, they’re truly industrial facilities—which shades everything from construction through operation.
Look beyond the building
A data center’s roof and four walls are likely the least expensive part of the project to insure—and can conceal what makes the recent uptick in these projects unique. Individual AI servers can range from $50,000 to more than $500,000, with some data centers operating with thousands of active servers. The real value sits there, as well as in the electrical infrastructure, cooling systems, redundancies and backup capabilities. Understanding the property means understanding the systems inside it, not simply the structure that houses them.
Understand the variety of exposures
Construction and operational facilities have distinct risk profiles. Once a facility is running, an accurate, current statement of values must reflect both the building and its installed servers. A power interruption, catastrophe or cyber event can multiply the consequences and make exposures difficult to quantify.
While hyperscalers running their own operations may offer a clearer picture, the modeling remains a challenge. From a risk-control perspective, the priority is identifying how physical systems, operational dependencies and cyber threats intersect; cyber protection also needs layers, as no single control prevents everything.
Today’s data centers are more than large commercial properties.
Assess these four interconnected physical risks
Plan for technology that will change
AI compounds the above demands; higher power requirements and hotter-running chips call for stronger electrical and cooling infrastructure, backup systems and controls. Meanwhile, the technology continues to evolve, and a facility designed around today’s equipment must be capable of upgrading as computing requirements change. Questions about how the property will accommodate future workloads—and what those changes imply for operational risk—mean that construction planning must go well beyond opening day.
Power and cooling are fundamental risk considerations.
Start with a credible construction submission
For new projects, contractor capability is central. Starting with a skilled, qualified and trusted contractor helps reduce initial risks. That trust is essential—as is detailed information about contractors and owners, evidence that financing is secured and a realistic construction schedule. Where the facility will sit, what exposures it presents to the nearby public and where its power and water will come from can also shape policy coverage for hyperscale data centers.
Looking at hyperscale data centers differently
Data centers offer an exciting opportunity for carrier providers looking to capitalize on the boom, but underestimating the risk can lead to costly claims down the road. Past models don’t necessarily cover the newer risks, including higher energy requirements, cooling necessities and rapid technological advances. Today’s hyperscale data centers are closer to industrial exposures, not simply larger versions of yesterday’s properties.
The opportunity is significant, as is the need for discipline. To help a data center project find success from submission through operation, start with a submission from a trusted broker and rigorously assess both expected and emerging risks—and don’t underestimate the full breadth of a project’s scope.